September 2016

The Women’s Hospital was opened in 1968 to encourage more mothers to have their babies in hospital, leading to an overall drop in mortality rate for mothers. After major refurbishment in 1995, the new Birmingham Women’s Hospital was opened by the Duchess of Gloucester.

The works were carried out to the block that was part of the original hospital building. The asphalt had been repaired on numerous occasions and a decision was made to renew with a liquid overlay system after considering all other options.

The works were carried out to the rectangular asphalt roof, 8 storied up. The hospital was live throughout the contract and the work area was immediately above the ambulance area which had to maintain 24 hours access therefore all scaffolding was designed to accommodate this.

This also meant that there was restricted storage area and all materials were lifted to the roof area by an external goods lift.

There was extensive plant on the roof area and major telecommunications equipment. There had to be daily communication with the various telecom providers to ensure that mobile masts were switched off to prevent radiation exposure. Emergency airwaves had to stay open so Rio Group was required to carry out detailed planning to complete works safely.

 

Contact Us

Thank you for your interest in Rio Group. Please complete the form below if you have any questions regarding our products and services and we will contact you as soon as possible.



© Copyright Rio Group 2016
  •       
  •       

Rio Group,
50 Devon Street,
Nechells,
Birmingham,
B7 4SL
T   0121 359 5522
F   0121 359 8538
E   info@riogroup.co.uk
  •       
  •       

Please enter the captcha.